| 1 | Rerouting the discharge lines for stormwater and wastewater pumping stations to the new transmission line in Al-Samawah. | Al-Muthanna Sewerage Directorate | 2027 | 6,146,882,500 |
| 2 | Project to Rehabilitate Stormwater Transmission Lines in the City of Samawah and Al-Rumaitha District | Al-Muthanna Sewerage Directorate | 2026 | 1,822,050,000 |
| 3 | A project to lay transmission lines and networks in various areas of Al-Khidr District, and to lay a transmission line to the Fari' area and water networks in various areas of Al-Suwair District. | Al-Muthanna Water Directorate | 2026 | 821,408,000 |
| 4 | Laying the rainwater transmission line and replacing the old line in the Al-Hussein neighborhood. | Al-Muthanna Sewerage Directorate | 2024 | 4,718,600,0000 |
| 5 | Extension of a 500 mm diameter polyethylene transmission pipeline, 15 km in length, along the perimeter of Al-Rumaitha. | Al-Muthanna Water Directorate | 2024 | 3,277,400,000 |
| 6 | Reinforcing the Al-Najariya tail canals in the Al-Dawalim/Al-Majd area. | Directorate of Water Resources / Al-Muthanna | 2024 | 2,737,849,000 |
| 7 | Maintenance and repair of subsidence in the Samawah sewage network. | Al-Muthanna Sewerage Directorate | 2023 | 2,014,680,000 |
| 8 | Rerouting the transmission pipeline beneath Al-Qaimmaqamiyah Street and the Al-Baydah and Al-Huwaish pipelines, alongside the extension of networks in Al-Duwaizah, Al-Warka. | Al-Muthanna Water Directorate | 2022 | 454,900,000 |
| 9 | Extension of the transmission line from Al-Mu'allaq to the Al-Warka branch. | Al-Muthanna Water Directorate | 2022 | 112,640,000 |
| 10 | Construction of a stormwater drainage network in Al-Hakim neighborhood, including a lifting station and a transmission line. | Al-Muthanna Sewerage Directorate | 2021 | 2,084,728,500 |
| 11 | Extending the water network to the low-cost housing units, Al-Zuhour Neighborhood, and Al-Firdaws Neighborhood in Al-Khidr. | Al-Muthanna Water Directorate | 2020 | 505,400,000 |
| 12 | Construction of a 9-classroom intermediate school for girls in the Al-Tawba / Al-Khidr area. | Al-Muthanna Directorate of Education | 2021 | 594,433,000 |
| 13 | Contract for the rehabilitation of the old Samawa station | Al-Muthanna Electricity Directorate | 2020 | 175,225,000 |
| 14 | Construction of the Al-Noor Government Fuel Station | Oil Products Distribution Company | 2016 | 2,644,344,000 |
| 15 | Construction of a gas oil outlet at the Al-Rumaitha government fuel station. | Oil Products Distribution Company | 2014 | 629,675,000 |
| 16 | Tank Treatment and Storage Capacity Expansion for the Al-Rawnaq Government Fuel Station | Oil Products Distribution Company | 2014 | 435,795,000 |
| 17 | Establishment of the Shiite Endowment Directorate in Al-Muthanna. | Shiite Endowment Directorate / Al-Muthanna | 2013 | 1,705,385,500 |
| 18 | Project to Upgrade the Al-Khidr Government Fuel Station | Oil Products Distribution Company | 2013 | 685,550,000 |
| 19 | Construction of Umm al-Banin Girls' Secondary School | Al-Muthanna Directorate of Education | 2012 | 1,123,835,500 |
| 20 | Project to fence the plot belonging to Al-Khader gas station. | Oil Products Distribution Company | 2012 | 227,410,000 |
| 21 | Supply and installation of the Samawah microwave tower. | Al-Muthanna Communications and Postal Directorate | 2012 | 549,000,000 |
| 22 | Photocells for Lighting the Educational Zone / Al-Muthanna University | Al-Muthanna University | 2010 | 1,400,000,000 |
| 23 | Warehouse and Workshop Shed / Al-Muthanna University | Al-Muthanna University | 2010 | 379,800,000 |
| 24 | Al-Muthanna University / Educational District Drainage Canal | Al-Muthanna University | 2010 | 203,075,000 |
| 25 | Construction of a building, including the pouring of foundations, for the industrial water project at the Samawah Refinery. | Midland Refineries Company | 2008 | 353,725,000 |
| 26 | Construction of a shed for the Al-Muthanna Communications and Postal Directorate. | Al-Muthanna Communications and Postal Directorate | 2008 | 224,852,000 |
| 27 | Construction of roofing for the consolidated units in Al-Samawah, Al-Rumaitha, Al-Darraji, Al-Hilal, Al-Mamhalla, Al-Suwair, and Al-Khidr. | Al-Muthanna Water Directorate | 2008 | 295,880,000 |
| 28 | Construction of the Sayyid Muhammad Baqir al-Sadr Mosque and Husayniyah in Al-Muthanna / Al-Majd / Abu Awani. | Shiite Endowment Directorate / Al-Muthanna | 2008 | 290,134,800 |